“We are always serving our customers with our best merchandise.”
Resources |
1. metallic:Aluminum/Metal/Alloy metal/Stainless metal/Brass,copper,bronze and many others. two. plastic: Abs,POM,PE,PP,PVC,Pc,PMMA,Teflon,nylon and so forth. 3. other people: carbon fiber, glass,fiberglass, wood, difficult rubber and so on. |
Colour |
Silver, Gray, Black ,Gold or as client’s need |
Surface Roughness |
Ra0.8 ( without sharpening or grinding) |
Emblem Technique |
laser engraving, CNC engraving, display screen-printing and so forth. |
Surface area Finish |
Anodize sprucing zinc/nickel/chrome/gold plating, sand blasting, ect. |
Tolerance |
+/- .01–.05mm / can also be personalized |
Certification |
ISO SEPG |
Processing equipments |
CNC machining middle,NC lathe, Grinding machine, Automatic lathe equipment, Standard lathe machine,Milling equipment,Drilling equipment,EDM,Wire-cutting device,CNC bending machine and so on |
Screening machine |
Coordinate measuring equipment,Image measuring instrument,Caliper etc |
Application |
Healthcare Devices/Digital/ Industrial// Automation / motorcycle/3D printer |
The company was accredited by ISO9001:2008 High quality Administration Program.
Services |
OEM,ODM or as client’s requirement |
Packaging & Delivery
Packaging Information
one. inner packaging: plastic wrap, bubble bag, PE foam, EPE cotton,PP bag and so on.
2. outer packaging: carton box, picket scenario, plate and so on.
three. as for every customers’ necessity
Port
xiamen, or as client’s requirement
Lead Time :
Quantity(Items) | one – 20 | 21 – 100 | one zero one – 1000 | >1000 |
Est. Time(days) | five | 10 | twenty five | To be negotiated |
Trade Conditions | FOB, CIF, EXW |
MOQ | 1Pcs |
Port | xiamen, or as client’s prerequisite |
Delivery | By air (DHL,UPS,Fedex,EMS and so on.),By Sea,Express… |
Payment Strategy | T/T(financial institution transfer),L/C,paypal,western union, moneygram,escrow, cash etc |
Payment Terms | 50% just before production, fifty% before shipping |
Packing | internal box,numerous packing containers/learn carton or as customer’s requirement |
Shipping time | 5-7days for Alanple time,five-twenty five days for manufacturing |